跳至产品信息
Features:
2 Sets/Pack 16 x 2.3 x 2.4 mm Silver Stainless Steel Curved End Links Spring Bars for Bracelet Watch Bands
Made of strong and durable material for long service life.
Stainless steel curved end links spring bars for bracelet watch bands.
Generic watch parts accessories.
Sizes are shown in the picture.
Made in China.
Package includes: 4 pieces of end links.
促销价
$15.19
常规价格
$20.59
2 Sets/Pack 16 x 2.3 x 2.4 mm Silver Stainless Steel Curved End Links Spring Bars for Bracelet Watch Bands
Made of strong and durable material for long service life.
Stainless steel curved end links spring bars for bracelet watch bands.
Generic watch parts accessories.
Sizes are shown in the picture.
Made in China.
Package includes: 4 pieces of end links.